Flooring Project - Before and After Photos


Melbourne, FL - This flooring renovation replaced the previous bedroom floor covering with 200 square feet and luxury vinyl plank flooring, giving the room a clean, updated appearance. Included removing the old flooring, preparing and smoothing the subfloor, installing the new planks, and finishing the perimeter and doorway transitions.
Completion time was 2 working days.
Total cost of $2,170 for materials, labor, preparation, and disposal.


Palm Bay, FL - This commercial renovation features gray-brown wood-look plank flooring running through the hallway and adjoining rooms. We handled surface preparation, precise fitting around doorways, installation, and added temporary floor protection while other construction continues.
550 square feet of luxury vinyl plank - completed in 4 working days,
Total cost of $4,100 for materials, labor, minor preparation, and protection.


Melbourne, FL - This commercial flooring project included installing 1,100 square feet of gray wood-look porcelain tile throughout the main room and adjoining areas. Our scope covered subfloor preparation, tile installation and leveling, grouting, finished transitions, and final cleanup.
The project was completed in 5 working days at a total cost of $17,670, including tile, installation materials, labor, and minor floor preparation.


Satellite Beach, FL - This 1,500-square-foot flooring renovation refreshed a commercial lobby with geometric carpet that complements the reception desk and neutral walls. We removed the existing carpet, prepared the subfloor, installed the new carpet with carefully matched patterns and seams, and finishing transitions to the tiled entrance.
Completion in 5 working days.
Total cost was $17,775


Merritt Island, FL - This office renovation created a striking feature wall using polished marble-look porcelain tiles arranged in a bookmatched pattern.Our work included wall preparation, precision cutting and placement, leveling, grouting, and finishing around the existing display shelf. 100 square feet of tile.
Time to completion: 4 working days
Total Cost: $4,895



Palm Bay, FL - This staircase renovation replaced worn and incomplete stair coverings with vinyl plank with a dark wood-look finish. The scope included preparing the existing steps, fitting tread and riser coverings, installing matching stair nosings, and completing the white side trim.
15-step staircase, completion time was 2 working days
Total cost of $2,650.

We love luxury vinyl plank and tile because they handle daily wear, humidity, and moisture far better than most other materials. That matters in Florida, where mold can begin within 24 to 48 hours if moisture is not controlled properly.

In our opinion, tile flooring is a smart long-term investments for kitchens, bathrooms, entryways, and other high-moisture areas because it is durable and easy to clean. Porcelain tile is especially strong for these spaces because it has a water absorption rate of 0.5% or less.

Hardwood and engineered wood flooring add warmth, value, and an upscale finish to living spaces. Proper installation matters, and our opinion, engineered wood is often the more stable choice in humid environments like Palm Bay.

We recommend laminate flooring as a budget-friendly way to get the look of wood with strong scratch and wear resistance. Durability is measured using AC wear ratings from AC1 to AC6, which matches the product to the amount of traffic the floor will need to handle.

In our experience, proactive flooring repair and replacement help prevent damaged floors from turning into bigger problems over time. The EPA recommends drying wet materials within 24 to 48 hours to help prevent mold growth, risk of falls in the home and protecting home value

We see high customer demand for carpet in bedrooms, family rooms, and upstairs spaces. Not only does carpet add comfort, but it also softens noise, improves traction and creates a warmer feel underfoot.
*Pricing Disclaimer: Prices are general estimates for standard materials and installation. Final costs vary based on material selection, project size, floor removal, subfloor preparation, and installation complexity. Contact us for a free estimate.
Palm Bay Elite Flooring provides commercial flooring installation for offices, retail stores, medical facilities, and other business properties. We install durable, high-quality vinyl, carpet, tile, and specialty flooring with subfloor preparation, efficient scheduling, and minimal disruption to operations.
Many of our customers opt for commercial-grade luxury vinyl tile (LVT) and luxury vinyl plank (LVP) for offices, retail stores, medical facilities, and other commercial properties.


Our team handles commercial carpet tile installation for offices, schools, medical facilities, and other business interiors.
Commercial tile flooring, including porcelain, is a strong choice for restrooms, lobbies, breakrooms, restaurants, and other high-traffic areas that need durability and easier sanitation.


Tenant build-out and multi-unit residential flooring projects require materials that install efficiently, hold up to repeated turnover, and stay easy to maintain between occupants. We specialize in providing durable resilient surfaces and practical flooring systems.
*Commercial Flooring Pricing Disclaimer: Listed prices are general estimates for standard materials and installation. Final costs vary based on flooring selection, project size, existing floor removal, subfloor preparation, site conditions, and installation complexity. Contact us for a free, detailed estimate.
Choosing the right flooring depends on foot traffic, moisture exposure, maintenance requirements, appearance, and budget. Palm Bay Elite Flooring helps homeowners and businesses select durable, attractive flooring materials suited to their property and installation needs.
Flooring Material | Best Applications | Main Advantage |
|---|---|---|
Luxury Vinyl Plank (LVP) & Tile (LVT) | Homes, offices, retail spaces | Moisture resistance and easy maintenance |
Porcelain & Ceramic Tile | Kitchens, bathrooms, commercial spaces | Durability and water resistance |
Engineered Hardwood | Living areas, bedrooms, offices | Natural wood appearance |
Laminate Flooring | Bedrooms, living rooms, residential properties | Affordable wood-look flooring |
Carpet & Carpet Tile | Bedrooms, offices, professional spaces | Comfort and noise reduction |
Sheet Vinyl & Rubber Flooring | Healthcare, commercial, high-traffic areas | Resilience and easy maintenance |
Florida's humidity and concrete slab foundations make proper flooring selection and subfloor preparation especially important. Our team evaluates moisture conditions, surface preparation needs, and installation requirements to help ensure lasting performance.
The Palm Bay Elite Flooring Process
1. In-Home or On-Site Consultation
Meet to discuss flooring needs, measurements, materials, and pricing.
2. Material Selection & Clear Proposal
Finalize materials, project scope, and installation dates - Free Estimate.
3. Prep Work & Precision Installation
Remove existing flooring as needed, subfloor issues are addressed before installation begins and professionally install new materials.
4. Final Review & Clean Finish
The project ends with a full walkthrough to inspect completed installation, finish details, and leave the work area clean.
Led by Bryan Garcia and Lizvette Romero, Palm Bay Elite Flooring brings over 20 years of flooring installation experience to residential and commercial projects throughout Brevard County and Central Florida.
As a family-owned business, we take a hands-on approach to every project, emphasizing personal service, quality workmanship, and clear communication from the initial estimate through completion.
Our flooring team handles projects ranging from individual rooms and full-home replacements to commercial offices, retail stores, medical facilities, and tenant build-outs.
Recent commercial installations include Operation Dental in Clermont and Visionworks in DeLand, with projects exceeding 3,000 sq. ft. completed in as little as four days.
We have the experience and capabilities to coordinate flooring projects of different sizes while maintaining quality and efficient scheduling.
We provide free, detailed flooring estimates with clear project scopes, material recommendations, and expected installation timelines.
Our team emphasizes proper subfloor preparation, precise installation, and careful finishing to deliver durable, attractive floors.
With straightforward 50% deposit and 50% upon completion payment terms, customers know what to expect before work begins.
Palm Bay Elite Flooring proudly serves:
And surrounding nearby Space Coast communities.


"The Palm Bay Elite Flooring crew did an excellent job installing luxury vinyl plank throughout our home. The crew helped us choose the right product for our layout and explained why it would perform better with Florida humidity than some of the other options we were considering. The finished floors look beautiful, the transitions are clean, and the whole job was handled professionally from start to finish."
Andrew M.
Palm Bay, FL

"We hired Palm Bay Elite Flooring for new tile flooring in our kitchen, entryway, and bathrooms, and the results exceeded our expectations. Everything was carefully measured and installed with a lot of attention to detail, and the crew kept the work area clean throughout the project. The new tile completely changed the look of the house and feels much more durable and practical for our family."
Jen S.
Melbourne, FL

"Palm Bay Elite Flooring replaced the flooring in our office space, and the process was smooth from the initial estimate to the final walkthrough. They helped us choose a commercial flooring option that looked professional but could also handle daily foot traffic and regular cleaning. The work was completed on schedule, communication was clear, and the finished space looks far better than it did before."
Dan H.
Palm Bay, FL

"We needed flooring replaced in several units and common areas, and Palm Bay Elite Flooring was reliable, organized, and easy to work with throughout the entire project. They understood the importance of minimizing disruption, keeping the timeline moving, and delivering consistent results across multiple spaces. The quality of the installation was excellent, and we would absolutely use them again for future flooring work."
Henry D.
Palm Bay, FL
"Don’t settle for floors that wear out too soon—get your free quote today. Lasting results start with professional installation."
Project timelines vary depending on square footage, material type, and the condition of the existing subfloor. A straightforward single-room installation can often be completed in one to two days, while a full home or commercial space may take several days to a week or more.
Our flooring experts start with an in-home or on-site measurement so we can provide an accurate quote. Material selection follows, and lead times vary depending on what is in stock versus what needs to be ordered.
Subfloor preparation is a step we take seriously on every job. If there are uneven areas, moisture concerns, or old adhesive to remove, that adds time before installation begins. Rushing subfloor prep is one of the most common causes of flooring failures, and we do not skip it.
Once installation is complete, we do a final walkthrough with the customer to confirm everything meets expectations before we consider the job done.
In Florida, flooring contractors working on certain project types may need to hold an active state license. It is reasonable to ask any contractor you are considering to confirm their license status and verify it through the Florida Department of Business and Professional Regulation (DBPR).
Insurance is equally important. A legitimate flooring company carries general liability insurance and workers' compensation coverage. This protects you as the property owner if something is damaged or if a worker is injured on your property.
When it comes to warranties, there are two to pay attention to:
The Palm Bay Elite Flooring team of professionals is fully licensed and insured.
Our licensed and insured flooring experts provide straightforward quotes and explain the full scope of work before a project begins. Vague contracts or missing warranty details are worth questioning before signing anything.
Not every flooring problem requires a full replacement.
In some cases, cracked tile, damaged planks, loose carpet, worn transitions, or isolated moisture-related issues can be repaired without removing the entire floor.
The best approach depends on the age of the flooring, the extent of the damage, material availability, and whether the subfloor underneath is still in good condition.
Before installation day, furniture, fragile items, and small personal belongings should be removed from the work area unless other arrangements have been made.
It is also helpful to confirm access points, pets, parking, and any schedule constraints in advance so the installation can move more efficiently.
For some projects, existing flooring removal, moisture evaluation, or subfloor repairs may also be needed before new materials can be installed.
Many Palm Bay homes and commercial buildings have concrete slab foundations, and moisture can migrate through concrete even when the surface appears dry. Excessive moisture can damage flooring adhesives, cause vinyl or laminate flooring to fail, and contribute to recurring flooring problems.
Depending on the material and installation method, our team evaluates whether concrete moisture testing, vapor mitigation, or additional preparation is needed before installing new flooring. Manufacturer moisture requirements are especially important for glued-down commercial flooring.
Floating luxury vinyl plank (LVP) uses a locking system that allows the floor to expand and contract without being permanently attached to the subfloor. It is commonly used in residential installations and some light commercial spaces.
Glue-down luxury vinyl tile (LVT) or plank is adhered directly to a properly prepared subfloor and can be a better choice for high-traffic commercial environments, rolling equipment, and certain large installations.
Lian Flooring evaluates the building's use, moisture conditions, floor preparation requirements, and product specifications before recommending an installation method.
Yes, provided the flooring is selected for the intended use. Commercial-grade LVT, carpet tile, porcelain tile, and certain resilient flooring systems are designed to accommodate different levels of foot traffic, furniture loads, and maintenance requirements.
However, not every product marketed as commercial flooring performs equally. Wear-layer thickness, indentation resistance, adhesive specifications, and manufacturer classifications should be considered.
For medical offices, retail locations, and professional spaces, we help evaluate flooring products based on actual operating conditions rather than appearance alone.
Uneven concrete can cause problems such as gaps between flooring planks, movement underfoot, cracked tile, and premature wear. Before installation, the subfloor should be evaluated for flatness, cracks, and other conditions that may affect the finished floor.
Depending on the severity, preparation may involve grinding high spots, applying appropriate patching or leveling compounds, or addressing cracks before installation.
Not all cracks indicate structural problems, but active movement and significant settlement may require further evaluation before new flooring can be installed.
Many luxury vinyl plank and porcelain tile products resist water exceptionally well, but waterproof flooring does not necessarily make an entire floor assembly waterproof.
Water can still penetrate through perimeter gaps, transitions, plumbing openings, or improperly protected areas. Trapped moisture underneath floating flooring can also create problems, especially over concrete slabs.
For Palm Bay homeowners, the distinction between waterproof flooring material and a properly designed moisture-resistant installation is important, particularly in kitchens, bathrooms, laundry rooms, and ground-floor spaces.
Residential and commercial luxury vinyl flooring may look nearly identical, but their construction, performance ratings, and installation requirements can differ significantly.
Commercial products are often selected for greater wear resistance, dimensional stability, maintenance demands, and compatibility with heavier foot traffic or rolling loads. Wear-layer thickness is one consideration, but it should not be the only factor.
In many cases, yes. Modular flooring systems such as commercial carpet tile and certain glue-down luxury vinyl products allow individual damaged sections to be replaced without removing the entire floor.
The replacement material must be compatible with the existing installation, and matching the original color, pattern, and product can be difficult if the flooring has been discontinued.
For commercial property managers, retaining extra flooring materials from the original installation can make future repairs faster and more economical.
Medical and dental facilities often benefit from flooring materials that support routine cleaning, resist staining, and accommodate rolling equipment. Commercial sheet vinyl, glue-down LVT, and other resilient flooring systems are frequently considered for these environments.
The appropriate material depends on the room's function, cleaning protocols, infection-control requirements, and any applicable facility standards.
Lian Flooring has experience with commercial dental and vision-care projects, helping our team understand the importance of coordinating flooring specifications with the needs of professional healthcare environments.
Often, yes. Many flooring replacement projects can be completed around existing cabinets, vanities, and built-in fixtures, depending on the flooring material and installation method.
Floating flooring systems generally require appropriate expansion space and should not be restricted by heavy fixed cabinetry unless the manufacturer specifically permits it. Tile and certain glue-down products have different installation considerations.
Our team evaluates cabinet clearances, appliance access, transitions, and the existing floor layout to determine the appropriate installation approach.
Flooring estimates can differ because contractors may include different materials, preparation methods, installation requirements, and finishing details.
One estimate might include demolition, disposal, subfloor leveling, moisture testing, transitions, and baseboard work, while another covers only the flooring material and basic installation.
A lower initial estimate does not necessarily represent the lowest completed project cost. Property owners should compare the written scope, specified flooring products, preparation allowances, and exclusions before selecting a flooring contractor.